← Graph

Trailblazer Activity

concept 3 connections

Introduced in Trailblazer 2.1 alongside the existing operation concept. Activities are defined with the same step DSL but map directly to BPMN-style diagrams with arbitrary end events and can be nested inside other activities. Form the building blocks for application-wide workflows.

category
pattern
about
Trailblazer Activity concept
Introduces activities as the 2.1 BPMN-style extension of operations.
concept Trailblazer Activity
related_to
Activities were introduced in Trailblazer 2.1 alongside operations.
concept Trailblazer Activity
related_to
BPMN concept
Activities map directly to BPMN boxes, circles and events.

Provenance

Read by
11 extractions